How Recorded Development Agreements Shape an ALTA Title Survey

A development agreement signed years before you saw a property can still control where your driveway goes, who maintains the shared pond, and what road work you owe the local government. These agreements are recorded in the public land records, so they stay with the land when it sells. Buyers often learn about them late, sometimes just days before closing.
An ALTA title survey is one of the best ways to catch these issues early. The surveyor reviews the recorded documents listed in the title commitment and shows how each one sits on the ground. If you’re buying, financing, or developing commercial property, get the title commitment and every recorded agreement to your surveyor as early as you can. The survey can only be as complete as the records behind it.
How Development Agreements Affect ALTA Survey Scope
A development agreement is a recorded contract that sets conditions for how land gets built and used. It’s often signed by a developer, a property owner, and a local government. When one appears in Schedule B of the title commitment, which is the list of recorded matters the policy won’t cover by default, the surveyor has to review it. That review can expand the survey scope in ways buyers don’t expect.
Some agreements describe locations with exact bearings and distances. Others use loose wording like “the area shown on the approved site plan,” which means the surveyor has to find that exhibit or an older plan. More agreements on title usually means more research time.
Scope also depends on the Table A items the client and lender request. Items such as zoning, parking counts, and utility evidence can overlap with terms in a development agreement. Requirements vary by lender, title company, and project, so confirm the Table A list before fieldwork starts.
Mapping Easements, Access Rights, and Shared Improvements
Most development agreements create or reference property easements. An easement is a right for someone else to use part of your land for a set purpose, such as access, utilities, or drainage. The ALTA survey shows where each plottable easement falls on the property.
Agreements in mixed-use and multi-parcel projects tend to share a few common features. Each one can show up as a line, a shaded area, or a note on the survey. Watch for these items in particular:
- Cross-access easements that let traffic move between neighboring parcels
- Shared parking rights inside a retail center or office park
- Joint drainage systems, including retention ponds that serve several lots
- Utility corridors set aside for water, sewer, power, or fiber
- Shared entry drives, signs, or landscaped medians
Shared improvements need extra attention. The agreement may spell out who owns a pond or drive, who maintains it, and how costs get split. The survey shows where the improvement sits and whether it matches the recorded location, but the cost terms belong with your attorney.
Showing Development Obligations That Affect the Property
Some agreements create obligations instead of easements. Examples include road widening, dedicated right-of-way, buffers, setback lines, and limits on building use. When these have a physical location, the surveyor can usually show them or describe them on the drawing.
Not every obligation can be drawn. A promise to pay an impact fee or build a turn lane by a certain date has no line on the ground. The surveyor should still note that the document affects the property and has no plottable items, which tells you it needs legal review even if the map looks clean.
Ask for clear Schedule B notes. Each item should say whether it affects the property, whether it’s shown, and why if it isn’t. Vague wording like “may affect” leaves buyers and lenders guessing.
Comparing Recorded Agreements With Current Site Conditions
An ALTA survey compares what the records say with what actually exists on site. This is where development agreements often reveal problems. Sites change over the years, and the paperwork doesn’t always keep up.
A shared drive might sit outside its recorded easement. A required buffer could hold parking spaces, or a building may extend into a reserved right-of-way strip. Each of these can affect title coverage, financing, and future permits.
Phased projects are a common source of mismatches. Later phases are sometimes built to an amended plan that was never recorded. The surveyor flags the gap so the title company and your attorney can decide which version controls.
Using ALTA Survey Findings During Property Due Diligence
The survey findings should feed straight into your due diligence decisions. Buyers use them to negotiate, request fixes, or walk away. Lenders and title companies use them to decide on coverage and endorsements.
Once the survey arrives, work through it in a set order. Small misses here can turn into big problems after closing. Start with these checks:
- Compare every Schedule B item with the survey notes to confirm nothing was skipped
- Flag any improvement outside its recorded easement or inside a restricted area
- Send unresolved conflicts to your attorney and title company
- Ask whether a recorded amendment or written consent could fix a mismatch
- Check whether planned expansions conflict with any agreement
Timing matters more than most buyers think. Research on older agreements can take longer than fieldwork, especially when exhibits are missing. Order the survey as soon as the contract is signed and the title commitment is ready.
Frequently Asked Questions
What is an ALTA title survey?
An ALTA title survey is a detailed property survey prepared under standards from the American Land Title Association and the National Society of Professional Surveyors. It shows boundaries, improvements, easements, and recorded matters listed in the title commitment. Lenders, title companies, and commercial buyers rely on it to spot risks before closing. It’s most common for commercial, industrial, and multifamily deals.
Can a surveyor plot every item in a development agreement?
No, only items with a defined location can be plotted. That includes easements, setback lines, buffers, and dedicated strips of land. Fees, deadlines, and maintenance duties have no physical line to draw. The survey should still list each document and explain whether it contains plottable items.
Who gives the development agreements to the surveyor?
The title company usually supplies copies of the recorded documents listed in the title commitment. Your surveyor relies on that package to know what to review. If you know about an agreement that isn’t listed, tell both the title company and the surveyor right away. Missing documents can leave gaps in the survey and the title policy.
What happens if site conditions don’t match a recorded agreement?
The surveyor shows the conflict on the drawing and describes it in the notes. Your title company may add an exception or ask for a fix before offering certain coverage. Fixes can include a recorded amendment, a new easement, or written consent from the other party. Your attorney should guide which option fits your deal.
How long does an ALTA survey take when development agreements are involved?
Timing depends on site size, the number of recorded documents, and the Table A items requested. A simple site may move quickly, while a large multi-parcel project usually takes longer. Agreements with missing exhibits or several amendments add research time. Confirm the schedule with your surveyor before you lock in a closing date.